Updated Dec 14, 2021 Verified Pass C-IBP-2105 Exam in First Attempt Guaranteed [Q15-Q31]

Share

Updated Dec 14, 2021 Verified Pass C-IBP-2105 Exam in First Attempt Guaranteed

Free C-IBP-2105 Sample Questions and 100% Cover Real Exam Questions (Updated 82 Questions)


SAP IBP Certification Exam Details:

LevelAssociate
Exam CodeC_IBP_2105
Exam NameSAP Certified Application Associate - SAP Integrated Business Planning
Reference BooksIBP100, IBP110, IBP200, IBP700, IBP300, IBP600
Sample QuestionsSAP IBP Certification Sample Questions
Passing ScoreC_IBP_2105 - 64%
Duration180 mins
Number of Questions80
Schedule ExamSAP Training
Exam Price$550 (USD)

 

NEW QUESTION 15
Time profiles are made out of levels, which are in turn made out of periods. What are the ways SAP IBP identifies profiles and periods?

  • A. Periods are identified by an integer and profiles by an alphanumeric prefix.
  • B. Periods are identified by a start and end date and profiles by an integer.
  • C. Periods are identified by an alphanumeric prefix and profiles by an integer.
  • D. Both periods and profiles are identified by an integer.

Answer: B

 

NEW QUESTION 16
You want to restrict value entries outside of a specified range into a key figure. What setting will you use to achieve that goal?

  • A. IBP -> Lock Selected cells in IBP Formatting Sheet tab
  • B. By restricting data input in the Key Figure Configuration app
  • C. IBP -> Data Validation in IBP Formatting Sheet tab
  • D. Select Protect Active Worksheet in the About section of SAP IBP tab

Answer: B

 

NEW QUESTION 17
You are invited to review a problem with a customer's SAP IBP Excel template performance. What areas with the biggest potential performance impact would you focus on? Note: There are 2 correct Answers to this question.

  • A. Complex calculation graphs for key figures
  • B. Number of analytics charts displaying key figures' values
  • C. Excessive IBP formatting in Excel UI
  • D. Number of local members and complexity of calculations

Answer: A,C

 

NEW QUESTION 18
You create an S&OP operator for heuristics on an SAP IBP project. What must you enable for the S&OP operator that is specifically relevant for subnetworks?

  • A. Supply propagation
  • B. Normalize Quotas parameter
  • C. Compute Expected Supply parameter
  • D. Balance Receipts parameter

Answer: C

 

NEW QUESTION 19
You are using the Resource Location master data type. How do you specify capacity supply as time- dependent?

  • A. Set the Capacity Supply Time Series indicator in the Resource Location master data type.
  • B. Set the Capacity Supply additional attribute in the time profile.
  • C. Maintain the CAPASUPPLY key figure values in the planning area.
  • D. Set the Capacity Supply Time Series indicator attribute as a key.

Answer: A

 

NEW QUESTION 20
Which header name displays are available in the Report Options menu of the SAP IBP Excel interface?
Note: There are 2 correct Answers to this question.

  • A. Changed member names that the user had created
  • B. Business meaning, as defined in configuration
  • C. Full unique name including the dimension and technical name
  • D. Caption, as defined in configuration for the default name

Answer: B,C

 

NEW QUESTION 21
Which of the following stages can be modeled using scenarios from the S&OP planning cycle? Note:
There are 2 correct Answers to this question.

  • A. Demand review
  • B. Demand sensing stage
  • C. Demand-supply balancing
  • D. Data input review for inventory

Answer: A,C

 

NEW QUESTION 22
What function would you use to configure a year-to-date calculation?

  • A. Rolling Aggregation
  • B. Dynamic Rolling Aggregation
  • C. Cumulative Aggregation
  • D. Last Period Aggregation

Answer: C

 

NEW QUESTION 23
Which of the following are features of lag-based snapshots? Note: There are 2 correct Answers to this question.

  • A. Lag-based snapshots are created in the Configuration app for a fixed time range.
  • B. Target key figures for these snapshots are exposed to the user in planning views.
  • C. Lag-based snapshots are automatically assigned to a snapshot operator.
  • D. Target key figures for these snapshots must have lag as a root attribute.

Answer: C,D

 

NEW QUESTION 24
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing. Which of the following parameters can you model to plan production with extra shift(s)?

  • A. Incremental production values
  • B. Production source validity at the start of seasonal peak
  • C. Capacity expansion with additional costs
  • D. Adjusted production interactive values

Answer: C

 

NEW QUESTION 25
You need to create time periods for the time profile in a planning are
a. What should you be aware of when executing the Create Time Periods application job?

  • A. The planning area with this time profile must be activated so that the application job can proceed.
  • B. A time profile has to be activated so that the application job can proceed.
  • C. This application job cannot be scheduled for immediate start.
  • D. This application job can be run for multiple time profiles at once.

Answer: A

 

NEW QUESTION 26
SAP is transitioning IBP customers to the new process of export/import. What are some of the features of this new process? Note: There are 2 correct Answers to this question.

  • A. You can create a collection of items and export it.
  • B. You can export from a planning area that is on a different release.
  • C. You can move a transported item from one collection to another.
  • D. You can choose to import only some of the items that were exported.

Answer: B,C

 

NEW QUESTION 27
What are some of the available ABC segmentation methods in IBP? Note: There are 2 correct Answers to this question.

  • A. By Number of Items (Sorted Average)
  • B. By Pareto Principle (Sorted and Cumulated %)
  • C. By Number of Items (Sorted Values)
  • D. By Pareto Principle (Sorted and Calculated Values)

Answer: C,D

 

NEW QUESTION 28
Which of the following are functions of SAP IBP for demand? Note: There are 3 correct Answers to this question.

  • A. Detailed statistical analysis of demand data using the supply chain algorithm library
  • B. Demand sensing of demand data using predictive analytics tools
  • C. Detailed statistical analysis of demand data using predictive analytics tools
  • D. Demand sensing of demand data using the supply chain algorithm library
  • E. Embedded, on-the-fly demand analytics

Answer: C,D,E

 

NEW QUESTION 29
You are modeling a substitution scenario associated with a promotion. What are some of the Master Data parameters that you need to maintain to ensure desired results generated by the optimizer? Note:
There are 2 correct Answers to this question.

  • A. Loc-Prod Subst Valid-From Date
  • B. Flag 'Disable Substitution of Location Products'
  • C. Promotion duration
  • D. Location Product Sub Cost Rate

Answer: A,C

 

NEW QUESTION 30
Which features apply to quota violations modeled with the optimizer?

  • A. Min and Max Quotas have to be the same as sourcing ratios.
  • B. Quota violation cost is maintained as an attribute as a key figure.
  • C. Quotas can be modeled for sourcing location, production, and consensus demand.
  • D. Quotas require sourcing ratios to be maintained.

Answer: D

 

NEW QUESTION 31
......


SAP IBP Certification Exam Topics:

Topic AreasTopic Details, Courses, BooksWeighting
S&OP ReviewDescribe how IBP extends the logic of S&OP in the network using advanced demand and supply planning integrated with financial plans.

IBP200 (SAP IBP OD 2105)

< 8%
Planning Operators & Application JobsUse Planning Operators.

IBP300 (SAP IBP OD 2105)

> 12%
User InterfaceUse the Fiori Launchpad to customize the UI, work with Excel UI

IBP200 (SAP IBP OD 2105)

> 12%
General Configuration of a Planning AreaDisplay, create, copy, edit, check, and activate a planning area.

IBP200 (SAP IBP OD 2105)

> 12%
Key Figures & AttributesCreate and use key figures and attributes.

IBP200 (SAP IBP OD 2105), IBP300 (SAP IBP OD 2105)

> 12%
Demand PlanningCreate statistical forecast using historical data with basic methods.

IBP200 (SAP IBP OD 2105), IBP600 (SAP IBP OD 2105)

8% - 12%
Analytics and ReportingDefine and view information with user-defined charts and dashboards.

IBP200 (SAP IBP OD 2105), IBP300 (SAP IBP OD 2105)

< 8%
Supply and ResponseConfigure supply planning, run various solvers to generate planning results

IBP100, IBP110, IBP200 (SAP IBP OD 2105), IBP700 (SAP IBP OD 2105)

> 12%
InventoryOptimize inventory in the supply chain utilizing algorithms that derive inventory targets.

IBP100

< 8%
Solution ArchitectureDescribe the benefits of implementing SAP's Integrated Business Planning solution.

IBP100, IBP200 (SAP IBP OD 2105), IBP300 (SAP IBP OD 2105)

< 8%

 

Download Real SAP C-IBP-2105 Exam Dumps Test Engine Exam Questions: https://www.examdumpsvce.com/C-IBP-2105-valid-exam-dumps.html