
[UPDATED 2025] Read E-S4CON-2505 Study Guide Cover to Cover as Literally
100% Real & Accurate E-S4CON-2505 Questions and Answers with Free and Fast Updates
NEW QUESTION # 24
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.
- A. It explains the database migration option (DMO) of SUM.
- B. It is a operating system-specific document.
- C. It explains where to find information about the custom code analysis.
- D. It contains a section about the simplification item (SI) checks.
Answer: C,D
NEW QUESTION # 25
During the upgrade of your development system, you run into the adjustment of non-dictionary objects, handled by transaction SPAAU. There you find programs that are shown in status "automatic adjustment" (green traffic light).
What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. Before continuing with the next phase, SUM asks for a modification adjustment transport.
- B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport.
- C. SUM continues with the next phase and your modifications are kept as in the start release.
- D. SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.
Answer: A
NEW QUESTION # 26
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?
- A. Perform the migration of data to the new data structure.
- B. Check the compatibility of custom code with SAP S/4HANA.
- C. Run the database migration to the SAP HANA database.
- D. Solve problems from the simplification item (SI) checks.
Answer: B
NEW QUESTION # 27
During a SUM run, you want to check if the PARCONV_UPG phase is still running property. Where can you find information about this? Note: There are 2 correct answers to this question.
- A. Check the running batch job via Job Overview (SM37).
- B. Check the latest log files in the SUM directory, subdirectory a bap, subdirectory tmp.
- C. Check for running R3trans processes on the host where SUM is running
- D. Check for running R3load processes on the host where SUM is running
Answer: A,B
NEW QUESTION # 28
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. You need to build up an SI check framework by applying SAP Notes.
- B. The errors from the SI checks must be solved; otherwise, SUM will report an error.
- C. You need an SAP system based on AS ABAP 7.52 or above for the SI check framework.
- D. The Si checks are executed in the development system and the results are transported into the subsequent systems.
Answer: A,B
NEW QUESTION # 29
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? Note: There are 2 correct answers to this question.
- A. Import a transport request from the development system that contains the recording of the activation.
- B. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
- C. During conversion, SUM delivers some business functions already activated.
- D. Activate the required business functions manually in the production system.
Answer: A,C
NEW QUESTION # 30
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for thee last time?
- A. At the end of the downtime
- B. Before the downtime starts
- C. Early in the downtime
- D. As part of the cleanup process
Answer: B
NEW QUESTION # 31
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?
- A. Migration Server
- B. Migration Hub
- C. Transition Server
- D. Central Instance
Answer: A
NEW QUESTION # 32
How does SUM recognize modification adjustment transports from predecessor systems?
- A. By searching for transport requests in file umodauto.lst
- B. By searching for transport requests that are assigned to project SAP ADJUST
- C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- D. By searching for transport requests named <sid>KO<number>
Answer: A
NEW QUESTION # 33
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?
- A. Downtime conversion
- B. Downtime migration
- C. Shadow on target creation
- D. Silent data migration (SDM)
Answer: B
NEW QUESTION # 34
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
- A. To optimize the migration
- B. To optimize the main import
- C. To optimize the activation
- D. To optimize the conversion
Answer: A
NEW QUESTION # 35
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.
- A. Manually activate the adjusted dictionary objects.
- B. Create new versions of the objects you need to adjust.
- C. Release the transport request containing the modification adjustment.
- D. Assign the transport request as a modification adjustment transport.
Answer: B,D
NEW QUESTION # 36
You want to use the Custom Code Migration Work list via remote code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database?
- A. Download it from the SAP Support Portal.
- B. Configure it within transaction ATC.
- C. Apply the corresponding SAAP Note via the Note Assistant.
- D. Generate it by analyzing the specific custom code via RFC.
Answer: A
NEW QUESTION # 37
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
- A. SAP S/4HANA conversion without DMO
- B. SAP S/4HANA conversion including DMO
- C. DMO without system update
- D. Prerequisite check
- E. Benchmark tool
Answer: A,B,D
NEW QUESTION # 38
What is the benefit of using the UPGANAXML file from a previous SUM run?
- A. To make the progress information within SUM UI more accurate
- B. To repeat specific phases during the SUM run
- C. To skip selected phases during the SUM run
- D. To auto-fill specific fields on selected screens on the SUM UI
Answer: A
NEW QUESTION # 39
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question.
- A. TABIM_SHADOW_INC
- B. PARDIST_SHD
- C. PARMVNT_UPG
- D. TABIM UPG
Answer: C,D
NEW QUESTION # 40
......
Reliable Study Materials for E-S4CON-2505 Exam Success For Sure: https://www.examdumpsvce.com/E-S4CON-2505-valid-exam-dumps.html
Get Unlimited Access to E-S4CON-2505 Certification Exam Cert Guide: https://drive.google.com/open?id=1ZLEOcgecGLCJyJ9i_2dk75YcxhsyGb5n
