Those who MB-320 test is intended for are functional consultants. Thus, the individuals’ background should include possessing awareness regarding concepts that touch on principles of accounting as well as financial operations and are aimed at businesses, field service, customer service, retail, manufacturing, as well as the management of the supply chain. Ideally, the possible candidates specialize in at least one feature related to Finance as well as Operations, and that includes finance, supply chain management, and manufacturing.


Microsoft MB-320 Exam Syllabus Topics:

TopicDetails
Topic 2
  • Identify And Configure Batch Attributes For Processes
  • Integrate Manufacturing Processes With Warehouse Management System (WMS)
Topic 3
  • Create And Manage Co-Products And By-Products, Manage Planning Items, Formulas With Scalable And Percentage-Based Calculations
Topic 4
  • Identify Items And Substitute Items Within A Bill Of Material (BOM) Or Formula
  • Apply Product Compliance Standards
  • Set Up And Maintain Commodity Pricing
Topic 5
  • Configure And Manage Costing Sheets, Inventory Dimensions In Production, Manage Operations And Routes, Manage A Product Configuration Model
Topic 6
  • Implement Production Scheduling And Subcontracting
  • Implement Activity-Based Subcontracting
  • Perform Production Batch Order Lifecycle
Topic 7
  • Create And Manage Formulas With Co-Products, By-Products, And Planning Items
  • Configure And Manage Manufacturing Executions
Topic 8
  • Implement Parameters, Production Orders, And Life Cycle
  • Implement And Manage Subcontractors
Topic 9
  • Implement Containerized Packaging, Implement And Configure Rebates, Implement Lot And Batch Control Processes
Topic 10
  • Implement And Manage Work Calendars, Implement And Manage Resources
  • Describe The Purpose And Capabilities Of The Product Configuration Models
Topic 11
  • Identify The Capabilities And Limitations Of The Manufacturing Executions Module
  • Identify The Responsibilities Of The Security Role Managing The Production Processes
Topic 12
  • Configure And Manage Constraints, Build A Product Configuration Model
  • Create Common Components Of Production And Lean Orders
Topic 13
  • Manage Scheduling And Subcontracting
  • Perform Processes To Manage Scrap And Waste Of A Discrete Order
  • Create And Maintain Project Items And Item Tasks
Topic 14
  • Process Lean Orders By Using Kanban Boards
  • Process Production Orders
  • Identify The Process Workflows For Managing A Production Environment
Topic 15
  • Create, Process, And Manage Production Batch Orders
  • Create Planned Production Batch Orders By Using The Master Planning Module
Topic 16
  • Validate The Interconnectivity Between General Ledger And The Production Control Modules
  • Create And Manage Products
Topic 17
  • Perform Processes To Manage Scrap And Waste Of A Batch Order
  • Configure Batch Reservations And Expiration Dates
  • Perform A Batch Rework
Topic 18
  • Create And Configure Catch Weight Items, Production Flows, Manage Kanbans, Manage Formulas, Process Batch, Production, And Lean Orders
Topic 19
  • Implement And Test The Production Control Module
  • Identify Components Of Unified Manufacturing


Prerequisites

If you are planning to take the Microsoft MB-320 exam, you should know that it is designed for those individuals who have some experience working as a Functional Consultant and who want to move forward in their careers. There are a few prerequisites that the candidates need to fulfill before they take this test. They should have a good understanding of accounting principles, customer service, field service, retail, supply chain management concepts, financial operations of business, and more. In addition, they should be conversant with manufacturing practices and have proficiency in at least one feature set of Finance and Operations, including manufacturing, finance, and supply chain management.

 

NEW QUESTION 24
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).

After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)

You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)

You need to determine the method to schedule the production lines.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 25
A manufacturer uses route operations and job scheduling.
You use a unique calendar for a conveyor line. The company observes a decrease in the number of hours a conveyor line resource is operational due to breakdowns. You must make a temporary change to the number of hours the resource is available.
You need to adjust the efficiency percentage for the conveyor line calendar.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 26
You manage pricing for a food processing company. The raw materials used by the business is a commodity-traded product and has a changing purchase price.
You must implement the commodity pricing module. You create a pricing template with margin data.
You need to calculate the cost price for the manufactured goods as well as the sales price based on margin standards.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 27
A customer produces light projection toys for holiday decorations throughout the year.
You must implement Bills of material (BOMs) for the product lifecycle. The solution must meet the following requirements:

You need to create a BOM for each phase.
Which BOM types should you use? To answer, select the appropriate configuration options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 28
A company produces generic and name-brand paper plates in the same factory using standard costing and using the same Bill of materials and routes to produce both products. The finance and production teams want a way to view individual raw material consumption costs in the ledger. You need to add a production group to the finished good to control postings to the ledger. What should you do?

  • A. Create a production group for the finished good item.
  • B. Update the cost of the generic finished good item.
  • C. Create a production pool for the finished good item.
  • D. Create a new Bill of materials with alternate costs for the raw material.

Answer: A

 

NEW QUESTION 29
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.5 hours.
What three actions are required on the rework order? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Delete all route operations except for a half an hour stirring operation
  • B. Add a route operation for 0.5 run time hours of stirring
  • C. Delete all items from the production formula except for 20 grams of sugar
  • D. Manually reserve batch 120008 after estimating the batch order
  • E. Add 20 grams of sugar to the production formula

Answer: B,D,E

Explanation:
Section: Create, process, and manage production batch orders
Explanation/Reference:
https://technologyblog.rsmus.com/microsoft-dynamics/dynamics-365-for-finance-and-operations/rework-batch- orders-in-microsoft-dynamics-365-for-finance-and-operationscmpidblogtmc-ms-dynamics-1219d01/

 

NEW QUESTION 30
A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 31
A beverage company uses Dynamics 365 Supply Chain Management batch processing for production.
You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.
What is the ingredient type?

  • A. active
  • B. none
  • C. compensating
  • D. filler

Answer: A

Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/batch-balancing

 

NEW QUESTION 32
A company uses Process manufacturing.
You need to review formulas and how the different ingredient types impact the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/batch-balanci

 

NEW QUESTION 33
You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:

You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Review the resource group assigned to Operation 10. Check to see if there is a calendar assigned and if the calendar is expired.
  • B. Review the calendar for the resource to determine if it is expired.
  • C. Navigate to the work calendar and view working times. Validate that there are working days created in the scheduled period.
  • D. Review the available resources for Operation 10. Navigate to the Resource form and validate whether there is a calendar assigned

Answer: B,D

 

NEW QUESTION 34
A company sells large batches of chemicals. Item specifications vary from batch to batch.
You must fulfill multiple orders from the same batch of chemicals. If a single batch cannot be reserved, manual reservation must be used. The system must also make reservations based on the earliest batch receipt date.
You need to set up a new chemical item that automatically uses the new batch reservation logic.
Which three settings should you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. In the Item model group, select the FIFO inventory model.
  • B. In the Storage dimension group, select Coverage plan by dimension for the site and warehouse dimensions.
  • C. In the Item model group, select FEFO date-controlled.
  • D. In the Item model group, select Same batch reservation and Consolidate requirements.
  • E. In the Tracking dimension group, select Coverage plan by dimension for batch number.

Answer: A,C,D

 

NEW QUESTION 35
A company plans to account for indirect costs related to materials used to manufacture products.
The items used to manufacture products have surcharge rates that depend on the type of product being used.
You need to set up the costing sheet to include surcharges for specific items.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 36
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.
You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?

  • A. Set a variable scrap of five percent for the rubber BOM line
  • B. Increase the required quantity of the rubber component by five on the BOM
  • C. Add an additional BOM line for five inches and set consumption to Variable
  • D. Set a Constant scrap of five on the BOM line for rubber

Answer: D

Explanation:
Section: Create and manage production and lean orders
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-information-used-in-bom-calculations- with-standard-costs

 

NEW QUESTION 37
A company that uses discreet manufacturing concepts to produce solar panels has a temporary change of glass supplier. The substitute glass will only be used for three months. The company also uses Bill of materials (BOM) version to track changes of the raw materials.
Managers are manually adjusting the production picking lists to reflect the alternate glass that is being temporarily used. The time spent doing manual adjustments to production picking lists has become a burden.
You need to create a new BOM with the alternate glass and include a from and to date on the BOM version.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 38
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels.
Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration

 

NEW QUESTION 39
You are responsible for product and formula maintenance for a paint manufacturer.
You create a formula for white paint and add its lines. When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately.
You need to set up the formula line for the pigment.
Which formula feature should you use?

  • A. Variable
  • B. Scalable
  • C. Step consumption
  • D. Pegged supply

Answer: B

Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/formulas-vers

 

NEW QUESTION 40
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of you cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.5 hours.
What three actions are required on the rework order? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Manually reserve batch 120008 after estimating the batch order.
  • B. Delete all route operations except for a half an hour stirring operation.
  • C. Delete all items from the production formula except for 20 grams of sugar.
  • D. Add a route operation for 0.5 run time hours of stirring.
  • E. Add 20 grams of sugar to the production formula.

Answer: A,D,E

Explanation:
Reference:
https://technologyblog.rsmus.com/microsoft-dynamics/dynamics-365-for-finance-and-operations/rework-batch-o

 

NEW QUESTION 41
A company produces light projection toys for holiday decorations. The company plans to implement Lean manufacturing processes.
Production master data must meet the following requirements:
Visual templates for a holiday must only be included for in-store products where that holiday is celebrated Visual templates for a holiday must only be included for in-store products based upon that season Online customers must be able to order visual templates for any holiday or region.
You need to implement production master data.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 42
A company uses Dynamics 365 for Finance and Operations for Process manufacturing.
Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time.
You need to set up the system.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/set-up-product-sequences

 

NEW QUESTION 43
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 44
A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You have created the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You create separate subcontracting purchase orders to account for the service. You attempt to add the service item to the BOM. The system generates an error.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 45
A process manufacturing company is implementing Dynamics 365 for Finance and Operations. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 46
A company produces homeopathic lotions for pain relief and uses Dynamics 365 for Finance and Operations. You have replaced the vendor of a product's active ingredient with a new vendor. The new vendor is supplying the ingredient at a higher concentration of 25 percent.
The previous vendor concentration was 15 percent. You are consistently running out of two of the complimentary ingredients.
You need to update the formula and ingredient settings to allow for better order planning.
What should you do?

  • A. Modify the minimum and maximum value of the attribute for the active ingredient
  • B. Modify the target value of the attribute for the compensating ingredients
  • C. Modify the factor value of the compensation principle
  • D. Modify the target value of the attribute for the active ingredient

Answer: C

 

NEW QUESTION 47
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a vendor resource and work cell for outsourced painting; add the vendor resource to the work cell.
* Create a production flow process activity using the painting work cell and the service item for picking.
* When the service is required, create a purchase order to the subcontracting vendor and add a line for the service item and the vendor price.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

 

NEW QUESTION 48
......

Pass Your Microsoft Exam with MB-320 Exam Dumps: https://www.examdumpsvce.com/MB-320-valid-exam-dumps.html

MB-320 Exam Dumps PDF Updated Dump from  ExamDumpsVCE Guaranteed Success: https://drive.google.com/open?id=14kUOT6if3gjcqSX8Mc4328sAXRKbUmYH